Problem:

The client required the installation and commissioning of a 1.2 MW power plant at the Aynak Copper Mines in Logar Province. The site needed a complete setup of power generation equipment, proper system integration, and full operational readiness to ensure stable and reliable power supply for mining operations.

Solution:

The full power plant installation was completed, including placement and setup of all equipment. System integration and configuration were carried out to ensure seamless operation. Comprehensive testing, commissioning, and startup procedures were performed, after which the power plant was successfully handed over to the client in fully operational condition.

Customer Name

MCC‑JCL Aynak Minerals Company Limited (MJAM/MCC)

 

Location:

 

Aynak Copper Mines, Logar Province, Afghanistan


Project Description:

Installation and commissioning of a 1.2 MW power plant